Fogo De Chao Churrascaria

3101 Piedmont Rd, Atlanta, GA 30305
Steakhouse
License: Food Service
Last inspected: Mar 11, 2026
82
Score
Low Risk

Fogo De Chao Churrascaria, located at 3101 Piedmont Rd in Atlanta, GA, underwent a low-risk inspection on March 11, 2026. This inspection identified one major and two minor violations related to utensil storage, warewashing facilities, and water availability. The facility has a historical pattern of low-risk inspections across its three recorded assessments.

3
Inspections
0
Critical latest
1
Major latest
2
Minor latest
Inspection History
Mar 11, 2026
Routine
1 major violation. 2 minor violations.
82
Jul 23, 2025
Routine
1 critical violation.
86
Jan 3, 2025
Routine
2 major violations. 4 minor violations. 4 corrected on site.
67
Violations — Mar 11, 2026 Inspection
14B - utensils, equipment and linens: properly stored, dried, handled
Inspector notes: Observed food items on the floor throughout the main kitchen. CA advised PIC all food items need to be 6” off the ground. At least 6 inches (15 centimeters) above the floor.
511-6-1.05(10)(e)
15B - warewashing facilities: installed, maintained, used; test strips
Inspector notes: Observed final rinse dial on the dishwasher in main kitchen to not be moving. CA advised PIC to put in a work order to fix the dial. Warewashing Machines, Temperature Measuring Devices. A warewashing machine shall be equipped with a temperature measuring device that indicates the temperature of the water:
511-6-1.05(2)(y)
16A - hot and cold water available; adequate pressure
Inspector notes: Observed lack of hot water in the facility. CA advised PIC to put in a work order. Hot water generation and distribution systems shall be sufficient to meet the peak hot water demands throughout the food service establishment. Pf (h) Pressure. Water under pressure shall be provided to all fixtures, equipment, and nonfood equipment that are required to use water except that water supplied as specified under subsection (1)(k)1 and 2 to a temporary food service operation or in response to a temporary interruption of a water supply need not be under pressure
511-6-1.06(1)(g)
Priority (Critical)
Priority Foundation (Major)
Core (Minor)