Family Donuts

13801 Hiram Clarke, Houston, TX 77045
Café / Breakfast
Last inspected: Aug 29, 2025
86
Score
Low Risk

Family Donuts, located at 13801 Hiram Clarke in Houston, TX, underwent a low-risk inspection on 2025-08-29. This inspection identified three minor violations concerning refuse containers, wall and ceiling maintenance, and the installation of exposed utility lines. The facility has a history of mostly low-risk inspections across its six recorded evaluations.

6
Inspections
0
Critical latest
0
Major latest
3
Minor latest
Inspection History
Aug 29, 2025
Reinspection (002)
3 minor violations.
86
Aug 27, 2025
Reinspection (002)
5 minor violations. 1 corrected on site.
78
Aug 21, 2025
Reinspection (002)
8 minor violations. 2 corrected on site.
67
Jun 16, 2025
Routine Inspection (001)
14 minor violations.
50
Dec 4, 2024
Routine Inspection (001)
6 minor violations. 1 corrected on site.
74
Feb 9, 2024
Routine Inspection (001)
3 minor violations.
86
Violations — Aug 29, 2025 Inspection
Containers. containers stored outside the establishment / dumpsters / compactors / compactor systems / receptacles / waste handling units for refuse / recyclables / and returnables not provided with tight-fitting lids / doors / covers, not kept covered when not in actual use. in containers designed with drains, drain plugs shall be in place at all times, except during cleaning.
20-21.20(a)(03)
Maintenance. walls / ceilings, including doors, windows, skylights, and similar closures, not maintained in good repair.
20-21.23(a)
Utility line/duct installation. exposed utility service lines and pipes not installed in a way that does not obstruct or prevent cleaning of the walls and ceilings. utility service lines and pipes shall not be unnecessarily exposed on walls or ceilings in those areas listed in subsection (b) of this section. service lines behind counters used only for beverage preparation may be exposed on the inside counter walls if necessary for service and if kept to a minimum. if exposed in rooms or areas allowed in subsection (c) of this section, air conditioning / ventilation / heating ducts shall be of smooth rigid metal and designed with a circular cross-section.
20-21.23(f)
Priority (Critical)
Priority Foundation (Major)
Core (Minor)