Renaissance Atlanta Airport Hotel Restaurant

2081 Convention Center Concourse, Atlanta, GA 30337
American
License: Food Service
Last inspected: Dec 11, 2025
74
Score
Medium Risk

The Renaissance Atlanta Airport Hotel Restaurant, located at 2081 Convention Center Concourse in Atlanta, GA, had a moderate risk inspection on December 11, 2025, with a score of 74. This inspection identified two major and two minor violations, including issues with food storage, cleaning of food-contact surfaces, and the availability of hot and cold water. Previous inspections for this American cuisine establishment have generally been low-risk.

5
Inspections
0
Critical latest
2
Major latest
2
Minor latest
Inspection History
Dec 11, 2025
Routine
2 major violations. 2 minor violations. 1 corrected on site.
74
Jun 25, 2025
Routine
1 critical violation. 2 minor violations. 2 corrected on site.
78
Dec 31, 2024
Routine
1 critical violation. 1 minor violation.
82
Jul 23, 2024
Followup
2 minor violations. 1 corrected on site.
90
Jun 24, 2024
Routine
2 critical violations. 3 major violations. 3 minor violations. 1 corrected on site.
47
Violations — Dec 11, 2025 Inspection
4-2A - food stored covered
Inspector notes: Observed ice bin at the bar open. Advised PIC all foods shall be covered to prevent contamination.
511-6-1.04(4)(c)
4-2B - food-contact surfaces: cleaned & sanitized
Inspector notes: Observed bins with utensils (forks, knives, spoons and chopper) with encrusted debris on the surface stored with clean utensils. Advised PIC all food contact surfaces shall be cleaned to sight & touch.
511-6-1.05(7)(b)
16A - hot and cold water available; adequate pressure (corrected on site)
Inspector notes: Observed no cold water at the hand sink in the main kitchen. Advised cold water shall be available at all times. COS: Cold water was restored.
511-6-1.06(1)(g)
16B - plumbing installed; proper backflow devices
Inspector notes: Observed leak at the hand sink in the main kitchen. Advised PIC all plumbing shall be maintained in good repair.
511-6-1.06(2)(r)
Priority (Critical)
Priority Foundation (Major)
Core (Minor)