Doublegate Country Club
Last inspected: Jan 28, 2026
86
Score
Doublegate Country Club, located at 3800 Old Dawson Rd in Albany, GA, underwent a low-risk inspection on January 28, 2026. This inspection identified three minor violations related to food labeling, nonfood-contact surfaces, and the cleanliness of physical facilities. Across four scored inspections, Doublegate Country Club has historically maintained a low-risk status.
4
Inspections
0
Critical latest
0
Major latest
3
Minor latest
Inspection History
Jan 28, 2026
Routine
3 minor violations.
86
Jun 18, 2025
Routine
3 minor violations.
86
Sep 10, 2024
Routine
2 critical violations. 1 minor violation. 3 corrected on site.
70
Feb 13, 2024
Routine
1 critical violation. 2 major violations. 2 minor violations. 2 corrected on site.
64
Violations — Jan 28, 2026 Inspection
10D - food properly labeled; original container
Inspector notes: Observed the facility had no written consumer notification of the presence of major food allergens in unpackaged food items. CA: The permit holder shall notify consumers by written notification of the presence of major food allergens as an ingredient in unpackaged food items that are served or sold to the consumer. PIC was provided with a copy of the Food Allergens and Allergen Awareness handout.
511-6-1.04(7)(d)
15C - nonfood-contact surfaces clean
Inspector notes: Observed the fume hood not free from an accumulation of grease. CA: Nonfood-Contact Surfaces. Nonfood-contact surfaces of equipment shall be cleaned at a frequency necessary to preclude accumulation of soil residues. PIC will have the fume hood cleaned.
511-6-1.05(7)(d)
17C - physical facilities installed, maintained, and clean
Inspector notes: Observed the ceiling tiles in the kitchen not free from an accumulation of debris. CA: Floors, Walls, and Ceilings, Cleanability. Except as specified under subsection (2)(d) of this Rule and except for antislip floor coverings or applications that may be used for safety reasons, floors, floor coverings, walls, wall coverings, and ceilings shall be designed, constructed, and installed so they are smooth and easily cleanable. PIC will have the tiles cleaned.
511-6-1.07(2)(a)
Priority (Critical)
Priority Foundation (Major)
Core (Minor)
Nearby Restaurants