The Timeline Theatre Company, located at 5035 N Broadway in Chicago, IL, underwent a public health inspection on March 24, 2026. This inspection resulted in a moderate risk score of 61. The inspection identified one critical violation, two major violations, and three minor violations related to food service sanitation, food-contact surfaces, and thermometer accuracy.

1
Inspections
1
Critical latest
2
Major latest
3
Minor latest
Inspection History
Mar 24, 2026
License
1 critical violation. 2 major violations. 3 minor violations.
61
Violations — Mar 24, 2026 Inspection
City of chicago food service sanitation certificate
Inspector notes: NOTED NO CITY OF CHICAGO SANITATION CERTIFICATE(S) AVAILABLE. CERTIFICATE ON SITE IS FROM SERVSAFE ISSUED 7/18/25. INSTRUCTED TO HAVE THE ORIGINAL CITY OF CHICAGO ON SITE AT ALL TIMES OR CURRENT PROOF OF RECIPROCITY TO OBTAIN A CITY OF CHICAGO CERTIFICATE. PRIORITY FOUNDATION #7-38-012. NO CITATION ISSUED.
2
Food-contact surfaces: cleaned & sanitized
Inspector notes: WAREWASHING MACHINE NOT INSTALLED. UNABLE TO VERIFY UNIT SANITIZES PROPERLY. MUST INSTALL THE UNIT AND HAVE IT OPERATIONAL. PRIORITY VIOLATION 7-38-025. NO CITATION ISSUED.
16
Thermometers provided & accurate
Inspector notes: NOTED NO THERMOMETER ON SITE TO MONITOR THE INTERNAL FOOD TEMPERATURE OF TCS FOODS. INSTRUCTED TO HAVE ONE AT ALL TIMES. PRIORITY FOUNDATION VIOLATION #7-38-005. NO CITATION ISSUED.
36
Toilet facilities: properly constructed, supplied, & cleaned
Inspector notes: NOTED THE WASHROOM DOORS NOT SELF CLOSING. INSTRUCTED TO PROVIDE A SELF CLOSING DEVICE AT THE DOORS AND MAINTAIN.
53
Toilet facilities: properly constructed, supplied, & cleaned
Inspector notes: NOTED WASH ROOMS ON PREMISE WITH GARBAGE RECEPTACLES AND NO LIDS. INSTRUCTED TO PROVIDE TRASH CANS WITH LIDS AT ALL WOMEN WASH ROOMS AND UNISEX WASH ROOMS
53
Physical facilities installed, maintained & clean
Inspector notes: NOTED ROUGH AND UNFINISHED BRICK WALLS AT THE WASHROOM OF THE 2ND FLOOR. INSTRUCTED TO REFINISH WALLS TO BE SMOOTH AND EASILY CLEANABLE, NONABSORBENT.