El Pacifico

1354-1358 W Belmont Ave, Chicago, IL 60657
Mexican / Latin
Last inspected: Apr 19, 2011
82
Score
Low Risk

EL PACIFICO, located at 1354-1358 W Belmont Ave in Chicago, IL, underwent one inspection on April 19, 2011. This inspection, categorized as low risk, resulted in a score of 82 and documented four minor violations. These violations pertained to the design and maintenance of food and non-food contact surfaces, the cleanliness of equipment and utensils, and the condition and cleaning of floors.

1
Inspections
0
Critical latest
0
Major latest
4
Minor latest
Inspection History
Apr 19, 2011
Routine
4 minor violations.
82
Violations — Apr 19, 2011 Inspection
Food and non-food contact surfaces properly designed, constructed and maintained
Inspector notes: All food and non-food contact equipment and utensils shall be smooth, easily cleanable, and durable, and shall be in good repair. REPAINT WITH NON-TOXIC PAINT SURFACE UNDER THE PREP TABLE.(KITCHEN).
32
Food and non-food contact equipment utensils clean, free of abrasive detergents
Inspector notes: All food and non-food contact surfaces of equipment and all food storage utensils shall be thoroughly cleaned and sanitized daily.CLEAN INTERIOR OF DEEP FRYER,DUST AND OLD RAT DROPPINGS.
33
Floors: constructed per code, cleaned, good repair, coving installed, dust-less cleaning methods used
Inspector notes: The floors shall be constructed per code, be smooth and easily cleaned, and be kept clean and in good repair. SEAL BASEBOARD WALLS THROUGHOUT THE PREMISES, SPECIALLY BEHIND BAR AND KITCHEN.SWEEP BASEMENT AREA THROUGHOUT
34
Walls, ceilings, attached equipment constructed per code: good repair, surfaces clean and dust-less cleaning methods
Inspector notes: The walls and ceilings shall be in good repair and easily cleaned. SEAL ALL OPENINGS ON WALL AND CEILING TILES THROUGHOUT, INCLUDED AROUND PIPE.IF THE CELING TILES OPENING ARE TOO LARGE TO SEAL REMOVE AND REPLACE IT.SURFACE MUST BE SMOOTH , CLEANABLE AND NON ABSORBENT MATERIAL.(KITCHEN WEST WALL ABOVE SMALL COOLER).
35
Priority (Critical)
Priority Foundation (Major)
Core (Minor)